Header Ads

Calculating the Estimated Budget for Building a House

RAB BUILD AND DESIGN HOUSES

List of House Building Volume Calculations

EXAMPLE OF FORMULA DESCRIPTION OF 110 M2 HOUSE BUILDING 

TABLE OF CONTENTS :

I. PREPARATION WORK
  1. Land Clearing 
  2. Bowplank installation 
  3. Provision of Working Water
II. LAND AND URGAN WORK
  1. Excavation of Foundation Soil 
  2. Back Landfill 
  3. Sand Fill Under Foundation 
  4. Floor Elevating Sand Fill 
III. COATING AND PLASTERING WORK (Cement code : pc, Sand : psr)
  1. Anstamping work 
  2. Rock Foundation Pair (1 pc : 5 psr)
  3. Trasraam Wall Pair (1 pc : 3 psr)
  4. Pair of Common Walls (1 pc : 5 psr)
  5. Trasraam Wall Plastering (1 pc : 3 psr)
  6. Ordinary Wall Plastering (1 pc : 5 psr)
  7. Plastering the Outer Edge Foundation (1 pc : 5 psr)
  8. Wall Scratch
IV. CONCRETE WORKS 
  1. Sloof Concrete Cast (1pc : 2psr : 3krl)
  2. Practical Cast Concrete Columns (1pc : 2psr : 3krl)
  3. Cast Concrete Column Terrace (1pc : 2psr : 3krl)
  4. Ring Balk Concrete Casting (1pc : 2psr : 3krl)
  5. Cast Concrete Kitchen Table (1pc : 2psr : 3krl)
  6. Cast Concrete Neut (1pc : 2psr : 3krl)
V. WOOD AND GLASS WORK
  1. Pairs of Class I Timber Frames
  2. Pair of Wood Panel Doors
  3. pass. 3 mm Teacwood Double Door Leaf
  4. pass. Double Teacwood Door Leaf 3 mm zinc plated
  5. pass. Glass Shutters and Vents 3 mm
  6. pass. Kap and Gording wood
  7. Plank Lisplank Pair
VI. COUPLE OF ROOF AND CEILING
  1. pass. BJLS Zinc Roof 0.30 mm
  2. pass. Roof Roof Sleek Zinc 0.30 mm
  3. pass. 3 mm Plywood Ceiling & Frame
  4. pass. Ceiling Cover List (Profile)
VII. FLOOR JOB
  1. Pair of Ceramic Tiles 30/30
  2. Pair of 30/30 Mosaic Tiles
  3. Pair of Plint Tiles 10/20
  4. Pair of Porcelain Tiles 20/20
VIII. ELECTRICITY AND WATER INSTALLATION WORK
  1. Pair of Light Points
  2. Pair of 40 Watt TL Lamps
  3. Pair of 20 Watt TL Lamps
25 Watt Incandescent Lamp Pair
  1. Single Switch Pair
  2. Double Switch Pair
  3. Socket Plug Pair
  4. Cast Fuse Pair
  5. Earth Ground Pair
  6. Sink Pair
  7. Pair of Porcelain Tubs
  8. Closed Squat Couple
  9. Septic Tank Pairs and Impregnation
  10. Clean Water Installation Pair
  11. Dirty Water Installation Pair
  12. Floor Drain Pair
  13. Couple Water Faucet
IX. FINISHING WORK
  1. Wall paint
  2. Ceiling Paint
  3. Wood paint
  4. Zinc Paint
  5. Teak Oil
X. HANGERS AND LOCKS WORK
  1. Double Slaag Key Pair
  2. KM/WC Key Pair
  3. Grendel couple
  4. Hinge Pair
  5. Wind Hook Pair
  6. The Anker Doc couple
  7. Nuts, Bolts and Beughel U Pair
XI. OTHER WORK
  1. Pair of Drains around the Building (Buis Beton U 30 cm)
  2. Back Cleaning
 



Tidak ada komentar