Calculating the Estimated Budget for Building a House
RAB BUILD AND DESIGN HOUSES
List of House Building Volume Calculations
EXAMPLE OF FORMULA DESCRIPTION OF 110 M2 HOUSE BUILDING
TABLE OF CONTENTS :
I. PREPARATION WORK
- Land Clearing
- Bowplank installation
- Provision of Working Water
II. LAND AND URGAN WORK
- Excavation of Foundation Soil
- Back Landfill
- Sand Fill Under Foundation
- Floor Elevating Sand Fill
III. COATING AND PLASTERING WORK (Cement code : pc, Sand : psr)
- Anstamping work
- Rock Foundation Pair (1 pc : 5 psr)
- Trasraam Wall Pair (1 pc : 3 psr)
- Pair of Common Walls (1 pc : 5 psr)
- Trasraam Wall Plastering (1 pc : 3 psr)
- Ordinary Wall Plastering (1 pc : 5 psr)
- Plastering the Outer Edge Foundation (1 pc : 5 psr)
- Wall Scratch
IV. CONCRETE WORKS
- Sloof Concrete Cast (1pc : 2psr : 3krl)
- Practical Cast Concrete Columns (1pc : 2psr : 3krl)
- Cast Concrete Column Terrace (1pc : 2psr : 3krl)
- Ring Balk Concrete Casting (1pc : 2psr : 3krl)
- Cast Concrete Kitchen Table (1pc : 2psr : 3krl)
- Cast Concrete Neut (1pc : 2psr : 3krl)
V. WOOD AND GLASS WORK
- Pairs of Class I Timber Frames
- Pair of Wood Panel Doors
- pass. 3 mm Teacwood Double Door Leaf
- pass. Double Teacwood Door Leaf 3 mm zinc plated
- pass. Glass Shutters and Vents 3 mm
- pass. Kap and Gording wood
- Plank Lisplank Pair
VI. COUPLE OF ROOF AND CEILING
- pass. BJLS Zinc Roof 0.30 mm
- pass. Roof Roof Sleek Zinc 0.30 mm
- pass. 3 mm Plywood Ceiling & Frame
- pass. Ceiling Cover List (Profile)
VII. FLOOR JOB
- Pair of Ceramic Tiles 30/30
- Pair of 30/30 Mosaic Tiles
- Pair of Plint Tiles 10/20
- Pair of Porcelain Tiles 20/20
VIII. ELECTRICITY AND WATER INSTALLATION WORK
- Pair of Light Points
- Pair of 40 Watt TL Lamps
- Pair of 20 Watt TL Lamps
25 Watt Incandescent Lamp Pair
- Single Switch Pair
- Double Switch Pair
- Socket Plug Pair
- Cast Fuse Pair
- Earth Ground Pair
- Sink Pair
- Pair of Porcelain Tubs
- Closed Squat Couple
- Septic Tank Pairs and Impregnation
- Clean Water Installation Pair
- Dirty Water Installation Pair
- Floor Drain Pair
- Couple Water Faucet
IX. FINISHING WORK
- Wall paint
- Ceiling Paint
- Wood paint
- Zinc Paint
- Teak Oil
X. HANGERS AND LOCKS WORK
- Double Slaag Key Pair
- KM/WC Key Pair
- Grendel couple
- Hinge Pair
- Wind Hook Pair
- The Anker Doc couple
- Nuts, Bolts and Beughel U Pair
XI. OTHER WORK
- Pair of Drains around the Building (Buis Beton U 30 cm)
- Back Cleaning